PAPERS

Prastacos G.P., (1984): Blood Inventory Management: An overview of Theory and Practice, Management Science, 30(7), 777.

Prastacos G.P., (1983): Optimal Sequential Investment Decisions under conditions of uncertainty, Management Science, 29(1), 118.

Harhalakis G., Ioannou G., Minis I. and Nagi R., (1994): Manufacturing cell formation under random product demand, International Journal of Production Research, 32(1), 47-64.

Herrmann J.W., Ioannou G., Minis I., Nagi R. and Proth J.M., (1995): "Design of material flow networks in manufacturing facilities", Journal of Manufacturing Systems, 14(4), 277-289.

Delaney D., Herrmann J.W., Ioannou G., Lu T., Minis I., Mirza A.H. and Palmer R., (1995): Design and implementation of a hybrid manufacturing facility, Computers and Industrial Engineering, 29(3), 315-321.

Herrmann J.W., Ioannou G., Minis I. and Proth, J.M., (1995): A dual ascent approach to the fixed-charge capacitated network design problem, European Journal of Operational Research, 95(4), 476-490.

Tarantilis C.D., Ioannou G. and Prastacos G., (2005): Advanced vehicle routing algorithms for complex operations management problems, Journal of Food Engineering, 70(3), 455-471

Tarantilis C.D., Ioannou G., Kiranoudis C.T. and Prastacos G.P., (2005): Solving the open vehicle routing problem via a single parameter metaheuristic algorithm, Journal of the Operational Research Society, 56(5), 588

Papalexandris A., Ioannou G., Prastacos G. and Soderquist, K.E., (2005): An Integrated Methodology for Putting the Balanced Scorecard into Action, European Management Journal, 23(2), 214

Ioannou G. and Minis I., (1998): A review of current research on manufacturing shop design integration, Journal of Intelligent Manufacturing, 9(1), 57-72.

Herrmann J.W., Ioannou G., Minis I. and Proth J.M., (1999): Minimization of acquisition and operational costs in horizontal material handling system design, IIE Transactions, 31(7), 679-693.

Ioannou G. and Sullivan W.G., (1999): Use of activity-based costing and economic value analysis for the justification of capital investments in automated material handling systems, International Journal of Production Research, 37(9), 2109-2134.

Ioannou G., Kritikos M. and Prastacos G., (2001): A greedy look ahead heuristic for the vehicle routing problem with time window constraints, Journal of the Operational Research Society, 52(6), 523-537.

Ioannou G., Kritikos M. and Prastacos G., (2003): A problem generator-solver heuristic for vehicle routing with soft time windows, OMEGA, 31(1), 41-53.

Tarantilis C.D. and Kiranoudis C.T., (2004): A list-based threshold accepting method for job shop scheduling problems, International Journal of Production Economics, 77(2), 159-171

Ioannou G., Prastacos G. and Skintzi G., (2004): Inventory positioning in multiple product supply chains, Annals of Operations Research, 126, 195-214.

Papalexandris A., Ioannou G. and Prastacos G., (2004): Implementing the Balanced Scorecard in Greece: a Software Firm’s Experience, Long Range Planning, 37(4), 351-366.

Ioannou G. and Papadogiannis C., (2004): Theory of constraints-based methodology for effective ERP implementation, International Journal of Production Research, 42(23), 4927-4954.

Papalexandris A., Ioannou G., Prastacos G. and Soderquist K.E., (2005): An integrated Methodology for putting the Balanced Scorecard into action, European Management Journal, 23(2), 214-227.

Ioannou G., (2006): Time-phased creation of hybrid manufacturing systems, International Journal of Production Economics, 102(2), 183-198.

Ioannou G. and Mavri M., (2007): Performance-net: A decision support system for reconfiguring a bank’s branch network, OMEGA, 35(2), 190-201.

Zobolas G., Tarantilis C.D. and Ioannou G., (2006): "Extending Capacity Planning by Positive Lead Times and Optional Overtime", Earliness and Tardiness for Effective Master Production Scheduling, International Journal of Production Research, forthcoming.


Copyright © 2007 - Athens University of Economics & Business.
All rights Reserved (developed by SavvasT)